Discover many one of a kind train railway collectables at bargain prices. Lots to choose from: hornby, peco railways, marklin mini clubs, triang items and much more!

Signals & Switches

Railway centralization is designed for controlling all the switches and signals, in a railway station or its area. Control is exercised from a single control point to the entire system. In order to know the traffic condition on tracks, rail circuits work as sensors. more...

Home
Catalogues & Magazines
Finescale
G Gauge
Animals & Scenery
Buildings
Coaches
Locomotives
Other G Gauge
Signals & Switches
Track
Tunnels & Bridges
Wagons
HO Gauge
N Gauge
O Gauge
OO Gauge
Other Trains/ Railway Models
TT Gauge (3mm Scale)
Trains/ Railway Models
Z Gauge

And sometimes they are used as signal transmitting media.

Needs and requirements of station trackage centralization

The speed of train processing at the stations plays a major role in railway permitivity. Railway safety highly relies on station operation. Switch and Signal Centralization is a kernel of stationary automation. Centralization provides logical interaction and blockage in accordance to safety standards, as well as economical and beneficial switch and signal control within a distance.

Nowadays railway centralization is implemented by means of Electromechanical circuits, sometimes with a help of electronics and microprocessors. The general requirement is to be reliable and work without mistakes and failures. If a system fails, it must fail safely. Safety failure, is such a failure which can result in more prohibitive state of a centralization system. (i.e. Red light instead of Green) Unsafe failure is when a systems fails giving more permissive state then it should (Green or Yellow instead of Red) it is called an . Anything that may lead to unsafe failure, which threats 1000s of lives should be avoided (even though preventing from more advanced level). Failures must be safe, whenever they occur. Safe failure may cause delays, but no threat at all.

Anything that can lead to a failure of a system, (i.e. bad contact, operator's malpractice), should never cause an unsafe failure. That's why all the equipment ranging from relays and switches, should rather fail (not work) than to work wrongly.

Routing through station

When station entrance trackage allows multiple routes from one point to another, basic route is a shortest path. It has the minimal number of crossing with other tracks, and allow the maximal speed.; Any other route is called a variant route.;

Acceptance route provides train moving from the stretch to the station tracks.; Transfer Routes is for train which move from one station track to a consecutive.; Departure Routes allow trains to go from a station track to the consecutive stretch; Shunting Routes move the rolling units which are not ready to work in trains;

Technical Characteristics of Centralization

First there were mechanical systems, where the signal and switch transition were done mechanically, using the traction string laid under station from the control point to the switches and signals. Signal and switch control was done by hand, and blockage was done using special portable keys (key dependency)

Read more at Wikipedia.org


200 pcs Light Emitting Diode Leds 5mm Yellow Light £4.99 Lgb 50100 Jumbo Control Power Pack Transformer 10A 240V £175.00
Lgb Points - R/H and L/H switches and Buffer Stop £35.00 Lgb 50910 European Vr0-Vr1 Signal £50.00
Lgb 50920 European Hp0 / Hp1 Signal £60.00 224:Marklin or Similar Gauge 1 Warning Bell Unit £4.99
Marklin 1 59950 Railroad Crossing £64.95 Lgb Garden Railway Switch Control Box #51800 Nib £50.00
Lgb 50070 1 amp Electric Speed Controller M&B £125.00
Click to see more Signals & Switches items
Prices current as of last update, 12/01/08 11:23am.


Home Contact Resources Exchange Links eBay